Free Contractor Quote Generator — Australia
Create a professional quote tailored for contractor businesses in Australia. Generate professional quotes with validity dates, terms, and line item breakdowns.
Create Your Quote Now →Common Quote Line Items for Contractors
Here are typical items you might include on a contractor quote:
| Description | Unit |
|---|---|
| Contract labour | hour |
| Day rate | day |
| Project milestone | each |
| Equipment hire | day |
| Site allowance | day |
| Travel and accommodation | each |
Typical Contractor Pricing in Australia
Rates vary by state and job complexity, but these are the kinds of ranges contractors commonly charge:
| Item | Typical range |
|---|---|
| Contract labour | $70–$130 per hour |
| Day rate | $500–$1,200 per day |
| Project milestone | $1,000–$20,000+ |
| Equipment hire | $100–$400 per day |
| Site allowance | $40–$100 per day |
Compliance Tips for Contractors
- ABN must appear on all invoices; otherwise the payer must withhold 47% under PAYG.
- Taxable payments annual report (TPAR) may apply — check if your industry is covered.
- Contractor agreements should clarify GST status, payment terms, and intellectual property ownership.
How to Create a Contractor Quote
Follow these steps to put together a contractor quote with our free generator:
- Add your business details and logo, then set a validity period (e.g. 30 days) so the client knows how long the price stands.
- List each item of work as a line item with a clear description, quantity, and unit price.
- State your payment terms and any conditions (e.g. deposit required, price subject to site inspection) in the notes field.
- Download the quote as a PDF and send it before starting any work.
What to Include on a Contractor Quote
A contractor quote should cover these fields, plus a few billing norms specific to how contractors typically operate in Australia.
Fields to include
- Validity period: State how long the quoted price is guaranteed for — this protects you from rising material or labour costs.
- Scope of work: Describe exactly what is and is not included, so the client cannot assume extra work is covered.
- GST treatment: Show whether the total is GST-inclusive or exclusive so there is no dispute when the invoice is issued.
- Acceptance method: State how the client should accept the quote (signature, email reply, or deposit payment) to create a clear record.
How Contractors typically bill
- Day rates or hourly rates are the norm for site-based contracting; fixed project fees are more common for defined deliverables.
- Invoices are usually issued fortnightly or monthly to match the client's accounts payable cycle.
- A purchase order number from the client is commonly quoted on the invoice to speed up processing.
- Site allowances and travel are billed as separate line items rather than folded into the day rate.
Contractors must quote an ABN to avoid 47% no-ABN withholding, and register for GST once turnover reaches $75,000 — many industries covered by contractors also require a Taxable Payments Annual Report from the businesses that hire them.
Common Mistakes to Avoid
Watch out for these common errors when preparing a contractor quote:
- Quoting a fixed price with no validity period, then honouring it months later at a loss.
- Leaving the scope vague, which invites scope creep once the job starts.
- Forgetting to note whether the price is GST-inclusive, causing disputes when the invoice arrives.
Frequently asked questions
Am I a contractor or an employee?
Do contractors need to pay their own super?
Should a contractor issue a tax invoice or a recipient-created tax invoice (RCTI)?
Is a quote legally binding in Australia?
How long should a quote be valid?
Should a quote show GST separately?
Ready to create your contractor quote?
Add your logo, customise colours, and download as PDF — completely free.
Open Quote Generator →